Pipeline/piping/project/mechanical
Резюме 183938 · 6 сентября 2016, 00:48
Имя | Айдан | Контакты | Доступны бесплатно после регистрации или входа |
Общая информация
| Город проживания | Астана | Заработная плата | По договоренности | График работы | Полный рабочий день / Вахтовый метод работы |
Образование |
Высшее | Опыт работы | 9 лет 4 месяца | Пол | Мужской | Возраст | 40 лет   (1 января 1984) |
Опыт работы
|
Период работы | июль 2015 — январь 2016   (7 месяцев) |
Должность | Senior Engineer (Pipeline / Piping) | Компания | KLPE LLP (50% - “United Chemical Company” LLP, Kazakhstan, 50% - LG Chem, LTD., South Korea) | Обязанности | Involved project: Construction of the Integrated Petrochemical Complex in Atyrau Oblast - Phase Two (Polyethylene) SOW comprises installation of: - Gas Separation Facilities (GSU) at Tengiz. - Integrated Petrochemicals Complex (IPC - Phase 2) at Karabatan. - Pipelines around GSU and between GSU and IPC - Phase 2. - Required Infrastructures, residential village, utilities and off sites Job duties: Checking and detecting weak points of ITB phase documentation for pipelines/piping scope Taking participation in choosing EPC Subcontractor for Pipeline scope Checking documentation of Bidders for major EPC Contract Consulting on various Pipeline issues Checking pipeline/piping drawings Use of AutoCAD program Achievements: Was promoted to Lead Pipeline Engineer position but the same time the Project was stopped because of the Foreign Partner left the Project |
|
Период работы | июль 2013 — март 2015   (1 год 9 месяцев) |
Должность | Field Project engineer | Компания | Tengizchevroil LLP (via KIS/Orion LLP), Tengiz o/f | Обязанности | Involved project: TCO Second Generation Plant Water Handling Upgrade (Major Capital Project) SOW comprises installation of: Pipe Racks Sour Water Stripper Column Pump Shelters UG closed drainage Pump House / Acid Storage + HVAC equipment Vessels / Coolers / Heat Exchangers De-mineralization / Condensate Polishing Mixed Bed resin package SW KO and SW flash drums, above ground storage tanks and other equipment, etc. Job duties: Managing all Project drawings conformance with Construction; Providing Engineering/Technical support to WHU Construction Team Ensuring there is a good communication between Field and Engineering; Management and control of all technical issues together with SEQ (site engineering queries) and ITC (instruction to Contractor) systems. Managing all project changes associated with project site work through as-built process; Review and approval of key Project documents (Job Packs, Procedures, Plans, Reports, etc.) Making sure all construction and fabrication works conform with latest revision drawings Use of AutoCAD program Achievements: My salary level was promoted 3 times in the course of 2 years; Was able to demonstrate to my Line Supervisor my excellent Time management skills by managing large amount of work in limited amount of time under pressure As a Project Engineer on Field, I created one-of-a-kind reports which substantially optimized work process and saved huge time of mine and of Team (“Holds on drawings”, “As-builts on drawings”, “Job Packs & Drawings Issuance Management”, “Weekly Engineering Update”, “Tie-in Execution Pack” etc.) Initiated and organized Nauryz Party (Kazakh New Year) for several Capital Projects Personnel over 100 people that went extremely well; |
|
Период работы | декабрь 2011 — июль 2013   (1 год 8 месяцев) |
Должность | Senior Pipeline engineer / Project engineer | Компания | Tengizchevroil LLP (via KMG-Project LLP), Atyrau city, Kazakhstan | Обязанности | Involved projects: MS 8 debottlenecking at Tengiz o/f (Installation of 12” Gathering Pipeline) MS 20 and MS 19 debottlenecking at Tengiz o/f (Installation of 12” Gathering Pipeline) CFM KTL trunk line debottlenecking at Tengiz o/f (Installation of 18” Gathering Line) SOW comprises installation of: Aboveground & underground piping, Piping tie-ins Piping Manifold Pig Launcher / Receiver 12” underground gathering Pipeline 3” underground Fuel Gas Line RTU FO cables, etc. Job duties: Development of weekly and monthly Project reports for technical meetings, participation in such a meetings; Participation in PHA (Process Hazard Analysis) meetings; Active Engineering assistance on procurement issues; Management of all valves & equipment passports; Preparation of job tasks for Contractor Engineering disciplines; Coordination of project activities with other groups including Piping, Civil, DCC, Planning; Development of technical reports and job packs; Manage & check Pipeline Engineering documents including alignment Sheets, Routing plan and Crossing detail drawings, Route Selection drawings produced by contractors; Preparation of Pipeline related MR’s, PR’s, MTO, Data sheets; Effective & timely solution of Pipeline related Site Queries Frequent use of AutoCAD program Achievements: My salary was increased for 50% after 3 months of starting this position Was officially replacing Project Manager in cases of his absence to represent Project Management; As a Project Engineer, I created one-of-a-kind reports which substantially optimized work process and saved huge time of mine and of Team (“Weekly Engineering Update Report”, “Drawings Report”, “Materials Report (valves)”, “Materials Passports Report" etc,) As a Pipeline Engineer, I solved the critical issue for the Project regarding the deviation from local code of the pipeline road crossing with sleeve. I prepared reports for that, also met with State DES Inspector and received his approval for deviation Proactively promoted & participated in monthly TCO FE “Lunch & Learn” Meeting with a Pipeline topic; |
|
Период работы | июль 2006 — октябрь 2011   (5 лет 4 месяца) |
Должность | Senior Piping / Pipeline Engineer; Piping / Pipeline Designer | Компания | KazNefteGasConsulting LLP, Kyzylorda city | Обязанности | Involved projects: Flowlines with producing wellhead setup of Nuraly o/f. Construction of flow lines from wells KS #321, 322, 4000, 4004, 4005 Aryskum oil gathering system. Flowlines from AR9HW, 212, 213, 135 and 136 Modification of Kumkol formation pressure maintenance system. Injection line from water distributing point located at GS-4 to wellsite #2081 of Kumkol South oilfield. Injection line from water distribution point to well AR 31 South Kumkol group station GS-3 SK Aryskum oil field development. Oil gathering system at Aryskum o/f. II stage. Installation of 200m3 settler at Aryskum CPF Installation of extra heater PTB-5 at Aryskum CPF Installation of operational metering system at Kyzylkia CPF outlet Installation of Sulzer booster pump and oil metering unit at Aryskum CPF Job duties: Advanced experience in development of explanatory notes, piping and instrument diagrams, layout plans, alignment sheets, isometric drawings, and specifications for various equipment, materials and instrumentation. Experience in development of reports, line designation tables, main equipment lists, main loads list, plot plans, overall schematics, engineering packages etc. Materials selection for pipes and valves Designing of oil and gas, underground and overhead production systems and pipelines. Line economical calculation, hydraulic design and option of pumps, pipes, valves and other materials and equipment. Projects of different type including valve replacement, pipeline replacement, equipment modification, drain lines connection. Development and correction of isometric drawings, process diagrams Active everyday use of AutoCAD program Achievements: I started my career in this Company from being Piping / Pipeline Designer and in the course of 2 years was promoted to Senior Piping / Pipeline Engineer; As a Piping / Pipeline Engineer / Designer I optimized day-to-day activities by creating lot of shortcuts; saving lot amount of time of myself and the Team Also I created optimized knowledge base for the Piping / Pipeline Team; which contributed to efficient work of the team |
Образование
|
Образование | Высшее |
Окончание | 2011 год |
Учебное заведение | Loughborough University, Loughborough town, Leicestershire, UK |
Специальность | Chemical Engineering Department (Holder of the “Bolashak” scholarship, awarded by Kazakhstan President) Specialty: MSc, Advanced Process Engineering (Certificate No.: 1134145740) |
|
Образование | Высшее |
Окончание | 2006 год |
Учебное заведение | The Korkyt Ata Kyzylorda State University, Kyzylorda city, Kazakhstan. |
Специальность | Oil and Gas faculty, Specialty: Engineering, Construction & Operation of Oil/Gas Pipelines and Oil/Gas Storages (Diploma No. 0087840) |
Дополнительная информация
| Иностранные языки | Английский (Свободный), Русский (Свободный) | Владение компьютером | Эксперт | Навыки и умения | PERSONAL SKILLS: - Good Organizational Skills; - Good Mentoring Capabilities; - Strong analytical skills; - Work well as an individual or as part of a team; - Excellent memory; - Excellent attention to details; - Fast learner; - Excellent handling of big data TIME MANGEMENT SKILLS: - Highly efficient use of time; - Optimization of work process; - Ability of Setting Priorities; - Ability of High concentration on work; - Effective dealing with distractions; SPECIFIC SKILLS: - Advanced report writing skills; - Advanced presentation skills; - Excellent knowledge and ability to use the Local and International Codes as well as TCO Specifications; - Excellent knowledge and ability to use Technical and Engineering Books & Web-Sites - Excellent Safety Culture knowledge gained from TCO Safety system |
|